Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Construction of cut-off walls in stages II cofferdam for Three Gorges Project (China)
Construction of cut-off walls in stages II cofferdam for Three Gorges Project (China)
Construction of cut-off walls in stages II cofferdam for Three Gorges Project (China)
Zhiyu, S. (Autor:in) / Huichao, D. (Autor:in) / Yangcheng, J. (Autor:in) / Turfan, M. / International Commission on Large Dams
International symposium, Dam foundations problems and solutions ; 1999 ; Antalya, Turkey
Dam foundations problems and solutions ; 267-272
01.01.1999
6 pages
Held as part of the 67th Annual meeting of International Commission on Large Dams
Aufsatz (Konferenz)
Englisch
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
Construction process simulation for the RCC cofferdam in Three Gorges Project
British Library Conference Proceedings | 2004
|The cut-off walls in the second-phase cofferdam of the three Gorges project
British Library Conference Proceedings | 2000
|Design of the Third Phase RCC Cofferdam of the Three Gorges Project
British Library Conference Proceedings | 2002
|Dispatching Operation Schemes of the Three Gorges Project in Cofferdam Impoundment Period
British Library Conference Proceedings | 2004
|Seepage problems of deepwater high earth-rock cofferdam in Three Gorges Project
British Library Online Contents | 2005
|