Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Construction of Inclined Tunnel for HRT of Ranganadi Hydroelectric Project and a Typical Adit Junction to Inclined Tunnel-A Case Study
Construction of Inclined Tunnel for HRT of Ranganadi Hydroelectric Project and a Typical Adit Junction to Inclined Tunnel-A Case Study
Construction of Inclined Tunnel for HRT of Ranganadi Hydroelectric Project and a Typical Adit Junction to Inclined Tunnel-A Case Study
Varangaonkar, R. D. (Autor:in) / Kaushish, S. P. / Ramamurthy, T. / International Tunnelling Association / India
International conference, Tunnelling Asia '2000; need for accelerated underground construction, issues and challenges ; 2000 ; New Delhi
01.01.2000
9 pages
Includes bibliographical references and index
Aufsatz (Konferenz)
Englisch
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
Progress in San Jacinto Tunnel speeded by inclined adit
Engineering Index Backfile | 1936
Exploratory adit for Niagara River Hydroelectric Development
Online Contents | 1995
|Construction of Diversion Tunnel for Doyang Hydroelectric Project - A Case Study
British Library Conference Proceedings | 2000
|