Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
The Study on Stripping Time of Concrete Lining in Construction of Derivation Tunnel in ASAHAN NO.1 Hydropower Station Project
The Study on Stripping Time of Concrete Lining in Construction of Derivation Tunnel in ASAHAN NO.1 Hydropower Station Project
The Study on Stripping Time of Concrete Lining in Construction of Derivation Tunnel in ASAHAN NO.1 Hydropower Station Project
Yan, Q.L. (Autor:in) / Peng, H. (Autor:in) / Mao, S.Y. (Autor:in) / Zheng, C.Y. (Autor:in) / Liu, S.L. (Autor:in) / Liu, S. (Autor:in) / Jiang, Changbo / Yang, Zhaohui Joey
International conference, Civil, architectural and hydraulic engineering ; 2012 ; Zhangjiajie, China
01.01.2012
6 pages
Based on those presented at the conference. Includes bibliographical references and index.
Aufsatz (Konferenz)
Englisch
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
Trans Tech Publications | 2012
|Indonesia's Asahan hydro project
Tema Archiv | 1983
|Indonesia's Asahan hydro project. II
Tema Archiv | 1983
|TUNNEL LINING CONCRETE AND CONSTRUCTION METHOD OF LINING CONCRETE
Europäisches Patentamt | 2017
|