A platform for research: civil engineering, architecture and urbanism
The Study on Stripping Time of Concrete Lining in Construction of Derivation Tunnel in ASAHAN NO.1 Hydropower Station Project
The Study on Stripping Time of Concrete Lining in Construction of Derivation Tunnel in ASAHAN NO.1 Hydropower Station Project
The Study on Stripping Time of Concrete Lining in Construction of Derivation Tunnel in ASAHAN NO.1 Hydropower Station Project
Yan, Q.L. (author) / Peng, H. (author) / Mao, S.Y. (author) / Zheng, C.Y. (author) / Liu, S.L. (author) / Liu, S. (author) / Jiang, Changbo / Yang, Zhaohui Joey
International conference, Civil, architectural and hydraulic engineering ; 2012 ; Zhangjiajie, China
2012-01-01
6 pages
Based on those presented at the conference. Includes bibliographical references and index.
Conference paper
English
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
Trans Tech Publications | 2012
|Indonesia's Asahan hydro project
Tema Archive | 1983
|Indonesia's Asahan hydro project. II
Tema Archive | 1983
|TUNNEL LINING CONCRETE AND CONSTRUCTION METHOD OF LINING CONCRETE
European Patent Office | 2017
|