The Study on Stripping Time of Concrete Lining in Construction of Derivation Tunnel in ASAHAN NO.1 Hydropower Station Project
The length of the stripping time of the diversion tunnel concrete lining of hydropower station will affect construction speed of the lining and increase the project cost. In combination with the actual situation of derivation tunnel in ASAHAN NO.1 hydropower station project, and using concrete strength test and mathematical model calculation, this article explores the proper stripping time of side and roof arch steel trolley.
The Study on Stripping Time of Concrete Lining in Construction of Derivation Tunnel in ASAHAN NO.1 Hydropower Station Project
The length of the stripping time of the diversion tunnel concrete lining of hydropower station will affect construction speed of the lining and increase the project cost. In combination with the actual situation of derivation tunnel in ASAHAN NO.1 hydropower station project, and using concrete strength test and mathematical model calculation, this article explores the proper stripping time of side and roof arch steel trolley.
The Study on Stripping Time of Concrete Lining in Construction of Derivation Tunnel in ASAHAN NO.1 Hydropower Station Project
Applied Mechanics and Materials ; 212-213 ; 815-820
26.10.2012
6 pages
Aufsatz (Zeitschrift)
Elektronische Ressource
Englisch
British Library Conference Proceedings | 2012
|Indonesia's Asahan hydro project
Tema Archiv | 1983
|Indonesia's Asahan hydro project. II
Tema Archiv | 1983
|TUNNEL LINING CONCRETE AND CONSTRUCTION METHOD OF LINING CONCRETE
Europäisches Patentamt | 2017
|