Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Hybrid Time-Cost Optimization of Nonserial Repetitive Construction Projects
Hybrid Time-Cost Optimization of Nonserial Repetitive Construction Projects
Hybrid Time-Cost Optimization of Nonserial Repetitive Construction Projects
Ezeldin, A.S. (Autor:in) / Soliman, A. (Autor:in)
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT ; 135 ; 42-55
01.01.2009
14 pages
Aufsatz (Zeitschrift)
Englisch
DDC:
624
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
Cost Optimization in Projects with Repetitive Nonserial Activities
British Library Online Contents | 2001
|A time-cost trade-off algorithm for nonserial linear projects
Online Contents | 1996
|A time-cost trade-off algorithm for nonserial linear projects
British Library Online Contents | 1996
|Scheduling of nonserial linear projects with multiple non-overlapped loop structures
Online Contents | 1995
|SCHEDULING OF NONSERIAL LINEAR PROJECTS WITH MULTIPLE NON-OVERLAPPED LOOP STRUCTURES
Taylor & Francis Verlag | 1995
|