Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
A time-cost trade-off algorithm for nonserial linear projects
A time-cost trade-off algorithm for nonserial linear projects
A time-cost trade-off algorithm for nonserial linear projects
Senouci, Ahmed B. (Autor:in) / Eldin, Neil N.
1996
Aufsatz (Zeitschrift)
Unbekannt
A time-cost trade-off algorithm for nonserial linear projects
British Library Online Contents | 1996
|Cost Optimization in Projects with Repetitive Nonserial Activities
British Library Online Contents | 2001
|Hybrid Time-Cost Optimization of Nonserial Repetitive Construction Projects
British Library Online Contents | 2009
|Scheduling of nonserial linear projects with multiple non-overlapped loop structures
Online Contents | 1995
|SCHEDULING OF NONSERIAL LINEAR PROJECTS WITH MULTIPLE NON-OVERLAPPED LOOP STRUCTURES
Taylor & Francis Verlag | 1995
|