Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
A time-cost trade-off algorithm for nonserial linear projects
A time-cost trade-off algorithm for nonserial linear projects
A time-cost trade-off algorithm for nonserial linear projects
Senouci, A. B. (Autor:in) / Eldin, N. N. (Autor:in)
CANADIAN JOURNAL OF CIVIL ENGINEERING ; 23 ; 134-149
01.01.1996
16 pages
Aufsatz (Zeitschrift)
Englisch
DDC:
624
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
A time-cost trade-off algorithm for nonserial linear projects
Online Contents | 1996
|Cost Optimization in Projects with Repetitive Nonserial Activities
British Library Online Contents | 2001
|Hybrid Time-Cost Optimization of Nonserial Repetitive Construction Projects
British Library Online Contents | 2009
|Scheduling of nonserial linear projects with multiple non-overlapped loop structures
Online Contents | 1995
|SCHEDULING OF NONSERIAL LINEAR PROJECTS WITH MULTIPLE NON-OVERLAPPED LOOP STRUCTURES
Taylor & Francis Verlag | 1995
|