Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Interim Consideration of the Columbia River Entrance
Providing for entrance channel of suitable alignment at mouth of Columbia River; channel would be obtained by dredging and construction of spur jetty on north shore, in combination with existing jetties, at additional cost of $10,- 340,000; re-evaluation of natural forces controlling regimen of entrance area.
Interim Consideration of the Columbia River Entrance
Providing for entrance channel of suitable alignment at mouth of Columbia River; channel would be obtained by dredging and construction of spur jetty on north shore, in combination with existing jetties, at additional cost of $10,- 340,000; re-evaluation of natural forces controlling regimen of entrance area.
Interim Consideration of the Columbia River Entrance
Lockett, John B. (Autor:in)
Journal of the Hydraulics Division ; 85 ; 17-40
01.01.2021
241959-01-01 pages
Aufsatz (Zeitschrift)
Elektronische Ressource
Unbekannt
Interim consideration of Columbia River entrance
Engineering Index Backfile | 1959
|Sediment transport and diffusion -- Columbia estuary and entrance
Engineering Index Backfile | 1967
|British Library Conference Proceedings | 1997
|