A platform for research: civil engineering, architecture and urbanism
Interim Consideration of the Columbia River Entrance
Providing for entrance channel of suitable alignment at mouth of Columbia River; channel would be obtained by dredging and construction of spur jetty on north shore, in combination with existing jetties, at additional cost of $10,- 340,000; re-evaluation of natural forces controlling regimen of entrance area.
Interim Consideration of the Columbia River Entrance
Providing for entrance channel of suitable alignment at mouth of Columbia River; channel would be obtained by dredging and construction of spur jetty on north shore, in combination with existing jetties, at additional cost of $10,- 340,000; re-evaluation of natural forces controlling regimen of entrance area.
Interim Consideration of the Columbia River Entrance
Lockett, John B. (author)
Journal of the Hydraulics Division ; 85 ; 17-40
2021-01-01
241959-01-01 pages
Article (Journal)
Electronic Resource
Unknown
Interim consideration of Columbia River entrance
Engineering Index Backfile | 1959
|British Library Conference Proceedings | 1997
|Arkansas river navigation entrance
Engineering Index Backfile | 1967
|