Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Interim consideration of Columbia River entrance
Providing for entrance channel of suitable alignment at mouth of Columbia River; channel would be obtained by dredging and construction of spur jetty on north shore, in combination with existing jetties, at additional cost of $10,- 340,000; re-evaluation of natural forces controlling regimen of entrance area.
Interim consideration of Columbia River entrance
Providing for entrance channel of suitable alignment at mouth of Columbia River; channel would be obtained by dredging and construction of spur jetty on north shore, in combination with existing jetties, at additional cost of $10,- 340,000; re-evaluation of natural forces controlling regimen of entrance area.
Interim consideration of Columbia River entrance
ASCE -- Proc (J Hydraulics Div)
Lockett, J.B. (Autor:in)
1959
24 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Interim Consideration of the Columbia River Entrance
ASCE | 2021
|Sediment transport and diffusion -- Columbia estuary and entrance
Engineering Index Backfile | 1967
|British Library Conference Proceedings | 1997
|