Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
PERENCANAAN SUMUR RESAPAN DAN SALURAN DRAINASE PADA PERUMAHAN CHANDRA KIRANA REGENCY KECAMATAN SINGOSARI, KABUPATEN MALANG
Six hectares Chandra Kirana Regency comprises 223 units. It needs a proper 1854 m drainage system completed with run-off water tanks to avoid it from floods.The objective of the study is to design the drainage system and run-off water tanks able to control the rainwater completed with the implementation cost and time.Site plan, topographic map, and rainfall data were needed to design. Rainfall data from 3 nearby stations: Singosari, Jabung, and Blimbing from 1991-2010 were analyzed to find out the maximum rainfall data and average rainfall regions using Mean Algebra. Log Pearson III was employed to obtain the rainfall, Mononobe method was for the rainfall intensity.The addition of rain water to waste water results in 0,00004 m/sec. cumulative discharge. Based on the result, and 0,5 m diameter culvert rings are designed. 1 m diameter and 2 m deep run-off water tank is of precast concrete. 93 work days implementation time at IDR 1.061.479.450,00.Keywords: design, drainage system, proper, rainwater, water tank
PERENCANAAN SUMUR RESAPAN DAN SALURAN DRAINASE PADA PERUMAHAN CHANDRA KIRANA REGENCY KECAMATAN SINGOSARI, KABUPATEN MALANG
Six hectares Chandra Kirana Regency comprises 223 units. It needs a proper 1854 m drainage system completed with run-off water tanks to avoid it from floods.The objective of the study is to design the drainage system and run-off water tanks able to control the rainwater completed with the implementation cost and time.Site plan, topographic map, and rainfall data were needed to design. Rainfall data from 3 nearby stations: Singosari, Jabung, and Blimbing from 1991-2010 were analyzed to find out the maximum rainfall data and average rainfall regions using Mean Algebra. Log Pearson III was employed to obtain the rainfall, Mononobe method was for the rainfall intensity.The addition of rain water to waste water results in 0,00004 m/sec. cumulative discharge. Based on the result, and 0,5 m diameter culvert rings are designed. 1 m diameter and 2 m deep run-off water tank is of precast concrete. 93 work days implementation time at IDR 1.061.479.450,00.Keywords: design, drainage system, proper, rainwater, water tank
PERENCANAAN SUMUR RESAPAN DAN SALURAN DRAINASE PADA PERUMAHAN CHANDRA KIRANA REGENCY KECAMATAN SINGOSARI, KABUPATEN MALANG
31.08.2015
doi:10.33795/prokons.v9i2.94
Prokons: Jurnal Teknik Sipil; Vol. 9 No. 2 August 2015; 90-96 ; 2714-8815 ; 1978-1784 ; 10.33795/prokons.v9i2
Aufsatz (Zeitschrift)
Elektronische Ressource
Englisch
DDC:
690
Evaluasi Saluran Drainase Jalan Manggis Kecamatan Patrang Kabupaten Jember
DOAJ | 2022
|Pemanfaatan Kolam Retensi dan Sumur Resapan pada Sistem Drainase Kawasan Padat Penduduk
DOAJ | 2019
|Studi Evaluasi Sistem Saluran Drainase di Kecamatan Kapas, Kabupaten Bojonegoro, Provinsi Jawa Timur
DOAJ | 2022
|