Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Building above steam operation presents problems
Experience at 12-story Post Office Building extending over tracks at Union Station in Chicago, shows destructive effect of smoke and gases on materials and equipment; in arrangement provided for disposing of smoke and gases emitted beneath building, plenum chamber was constructed continuously beneath first floor level with 4-in. reinforced concrete floor located to provide minimum clearance of 17 ft above top of rail.
Building above steam operation presents problems
Experience at 12-story Post Office Building extending over tracks at Union Station in Chicago, shows destructive effect of smoke and gases on materials and equipment; in arrangement provided for disposing of smoke and gases emitted beneath building, plenum chamber was constructed continuously beneath first floor level with 4-in. reinforced concrete floor located to provide minimum clearance of 17 ft above top of rail.
Building above steam operation presents problems
Ry Age
Railway Age ; 105
1938
5 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Building above steam operation presents problems
Engineering Index Backfile | 1938
Chicago concrete building presents difficult foundation problems
Engineering Index Backfile | 1930
|Autoroute bridge presents pier problems
Engineering Index Backfile | 1958
Underground command center presents problems
Engineering Index Backfile | 1964
|Excavation for Ville Marie presents problems
Engineering Index Backfile | 1959
|