Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Last change in Northern Pacific bridge involved replacement of truss spans and called for ingenious erection procedure; characteristics of various structures which have served at this location; wooden viaduct replaced in 1884.
Last change in Northern Pacific bridge involved replacement of truss spans and called for ingenious erection procedure; characteristics of various structures which have served at this location; wooden viaduct replaced in 1884.
Three stages in the life of a viaduct
Ry. Eng. Maintenance
Curtiss, L.B. (Autor:in)
1928
3 pages
7 Figs.
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
VIADUCT CONSTRUCTION METHOD AND VIADUCT CONSTRUCTION DEVICE
Europäisches Patentamt | 2021
|Three-way prestressing builds London viaduct
Engineering Index Backfile | 1961