A platform for research: civil engineering, architecture and urbanism
Last change in Northern Pacific bridge involved replacement of truss spans and called for ingenious erection procedure; characteristics of various structures which have served at this location; wooden viaduct replaced in 1884.
Last change in Northern Pacific bridge involved replacement of truss spans and called for ingenious erection procedure; characteristics of various structures which have served at this location; wooden viaduct replaced in 1884.
Three stages in the life of a viaduct
Ry. Eng. Maintenance
Curtiss, L.B. (author)
1928
3 pages
7 Figs.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
VIADUCT CONSTRUCTION METHOD AND VIADUCT CONSTRUCTION DEVICE
European Patent Office | 2021
|Three-way prestressing builds London viaduct
Engineering Index Backfile | 1961