Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Open and sheeted trench in sand, gravel, and muck with never less than 20 ft. of groundwater required unusual drainage and pipe-laying devices; sewer structure; soil and topography; draining a lake.
Open and sheeted trench in sand, gravel, and muck with never less than 20 ft. of groundwater required unusual drainage and pipe-laying devices; sewer structure; soil and topography; draining a lake.
Difficult sewer construction in wet ground
Eng. News-Rec
Wray, H.G. (Autor:in)
Engineering News Record ; 101
1928
4 pages
6 Figs.
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Sewer construction in difficult ground
Engineering Index Backfile | 1950
|Construction of a concrete sewer tunnel through difficult ground
Engineering Index Backfile | 1913
|Bypassing difficult sewer construction job
Engineering Index Backfile | 1944
|Difficult sewer construction in Minneapolis
Engineering Index Backfile | 1905
Difficult construction of concrete sewer
Engineering Index Backfile | 1910
|