Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Construction of a concrete sewer tunnel through difficult ground
Illustrated description of work in Toronto known as Barton Section 1, part of a system of storm overflow sewers. (2000 w.) (No. 39380)
Construction of a concrete sewer tunnel through difficult ground
Illustrated description of work in Toronto known as Barton Section 1, part of a system of storm overflow sewers. (2000 w.) (No. 39380)
Construction of a concrete sewer tunnel through difficult ground
Can Engr
Philips, H.S. (Autor:in)
1913
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Sewer construction in difficult ground
Engineering Index Backfile | 1950
|Difficult construction of concrete sewer
Engineering Index Backfile | 1910
|Difficult sewer construction in wet ground
Engineering Index Backfile | 1928
|Bypassing difficult sewer construction job
Engineering Index Backfile | 1944
|Difficult sewer construction in Minneapolis
Engineering Index Backfile | 1905