Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Driving and concreting railroad tunnel in shale and limestone
Construction of single-track railroad tunnel, 1050-ft long, for Pittsburgh Coal Co at Grimms Bridge, near East Liverpool, Ohio, in almost inaccessible location.
Driving and concreting railroad tunnel in shale and limestone
Construction of single-track railroad tunnel, 1050-ft long, for Pittsburgh Coal Co at Grimms Bridge, near East Liverpool, Ohio, in almost inaccessible location.
Driving and concreting railroad tunnel in shale and limestone
Contractors Engrs Monthly
1934
3 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1931
|Engineering Index Backfile | 1946
Concreting west Delaware tunnel
Engineering Index Backfile | 1960
|Concreting operations on Moffat water tunnel
Engineering Index Backfile | 1936
|Concreting a tunnel by compressed air
Engineering Index Backfile | 1913
|