A platform for research: civil engineering, architecture and urbanism
Driving and concreting railroad tunnel in shale and limestone
Construction of single-track railroad tunnel, 1050-ft long, for Pittsburgh Coal Co at Grimms Bridge, near East Liverpool, Ohio, in almost inaccessible location.
Driving and concreting railroad tunnel in shale and limestone
Construction of single-track railroad tunnel, 1050-ft long, for Pittsburgh Coal Co at Grimms Bridge, near East Liverpool, Ohio, in almost inaccessible location.
Driving and concreting railroad tunnel in shale and limestone
Contractors Engrs Monthly
1934
3 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1931
|Concreting west Delaware tunnel
Engineering Index Backfile | 1960
|Engineering Index Backfile | 1946
Concreting operations on Moffat water tunnel
Engineering Index Backfile | 1936
|Concreting a tunnel by compressed air
Engineering Index Backfile | 1913
|