Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Cologne road bridge
Brief description of Patton Bridge, second of semi-permanent " ice-proof" bridges completed in British zone of occupation, designed to carry 12-ton vehicles and trailers at nose to tail spacing, or 40 ton military traffic at 80-ft spacing; 240 ft central span, built from German SKR bridging, weighs 450 tons; span was rested on 50-ft high Bailey superstructure, which in turn rested on raft; at least two months of building time was saved by separate construction of central span.
Cologne road bridge
Brief description of Patton Bridge, second of semi-permanent " ice-proof" bridges completed in British zone of occupation, designed to carry 12-ton vehicles and trailers at nose to tail spacing, or 40 ton military traffic at 80-ft spacing; 240 ft central span, built from German SKR bridging, weighs 450 tons; span was rested on 50-ft high Bailey superstructure, which in turn rested on raft; at least two months of building time was saved by separate construction of central span.
Cologne road bridge
Engineer
Engineer ; 181
1946
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1950
Cologne-Muelheim suspension bridge
Engineering Index Backfile | 1929
|Hohenzollern bridge in Cologne
Engineering Index Backfile | 1953
|Cologne-Mulheim suspension bridge
Engineering Index Backfile | 1932
|Engineering Index Backfile | 1960
|