Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Partially suspended steel girder bridge is 691 m long, has 6 spans of various lengths, longest of which is 302 m; 67 m high single tower is unsymmetrically located near right bank and its 2 pylons meet at top, forming triangle; suspending cables spread out from top center of triangle to both sides, suspending span at 3 points on each side; details and calculations of design.
Partially suspended steel girder bridge is 691 m long, has 6 spans of various lengths, longest of which is 302 m; 67 m high single tower is unsymmetrically located near right bank and its 2 pylons meet at top, forming triangle; suspending cables spread out from top center of triangle to both sides, suspending span at 3 points on each side; details and calculations of design.
Severin bridge in Cologne
Die Severinsbruecke Koeln
Hess, H. (Autor:in)
Stahlbau ; 29
1960
37 pages
Aufsatz (Zeitschrift)
Deutsch
© Metadata Copyright Elsevier B. V. All rights reserved.
Assembly of steel superstructure of Severin bridge, Cologne
Engineering Index Backfile | 1960
|Engineering Index Backfile | 1950
Engineering Index Backfile | 1946
Cologne-Muelheim suspension bridge
Engineering Index Backfile | 1929
|