Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Comprehensive port construction program executed during 1956-1966 period at total cost of 140 million francs, consisted of extension of existing breakwaters, quays, and channels, as well as building of new ones; description of work executed in Tandjung-Priok and Semarang (Java), Balikpapan and Bandjermasin (Borneo), and Belawan (Sumatra); 60,000 tons of cement and 10,500 tons of steel were imported from France; project employed from 15 to 90 European engineers and specialists, and from 400 to 1800 Indonesian workers.
Comprehensive port construction program executed during 1956-1966 period at total cost of 140 million francs, consisted of extension of existing breakwaters, quays, and channels, as well as building of new ones; description of work executed in Tandjung-Priok and Semarang (Java), Balikpapan and Bandjermasin (Borneo), and Belawan (Sumatra); 60,000 tons of cement and 10,500 tons of steel were imported from France; project employed from 15 to 90 European engineers and specialists, and from 400 to 1800 Indonesian workers.
Les travaux portuaires en Indonesie
Les travaux portuaires en Indonesie
Launay, P. (Autor:in)
1966
17 pages
Aufsatz (Zeitschrift)
Französisch
© Metadata Copyright Elsevier B. V. All rights reserved.
VILLES PORTUAIRES - Cités portuaires d'Europe du Sud, une dialectique du métissage.
Online Contents | 2001
|RECONVERSIONS INDUSTRIELLES ET PORTUAIRES
Online Contents | 2004
Online Contents | 1996
|