Method of building north Cofferdam used on Bonneville main dam
Construction of final diversion unit with timber crib shore arms connecting to completed south half of dam; flood caused break resulting in change of design; progress on main dam; power house and lock; fishways.
Method of building north Cofferdam used on Bonneville main dam
Construction of final diversion unit with timber crib shore arms connecting to completed south half of dam; flood caused break resulting in change of design; progress on main dam; power house and lock; fishways.
Method of building north Cofferdam used on Bonneville main dam
Western Construction News
1937
4 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Jetty construction methods used to repair Bonneville cofferdam
Engineering Index Backfile | 1936
Placing cofferdam cribs at Bonneville
Engineering Index Backfile | 1936
|Cofferdam for hydraulic building construction and construction technology of cofferdam
Europäisches Patentamt | 2024
|Bonneville main dam. II -- Concreting Technique
Engineering Index Backfile | 1936
|TEMPORARY COFFERDAM METHOD, TEMPORARY COFFERDAM STRUCTURE
Europäisches Patentamt | 2022
|