A platform for research: civil engineering, architecture and urbanism
Method of building north Cofferdam used on Bonneville main dam
Construction of final diversion unit with timber crib shore arms connecting to completed south half of dam; flood caused break resulting in change of design; progress on main dam; power house and lock; fishways.
Method of building north Cofferdam used on Bonneville main dam
Construction of final diversion unit with timber crib shore arms connecting to completed south half of dam; flood caused break resulting in change of design; progress on main dam; power house and lock; fishways.
Method of building north Cofferdam used on Bonneville main dam
Western Construction News
1937
4 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Jetty construction methods used to repair Bonneville cofferdam
Engineering Index Backfile | 1936
Placing cofferdam cribs at Bonneville
Engineering Index Backfile | 1936
|Cofferdam for hydraulic building construction and construction technology of cofferdam
European Patent Office | 2024
|Bonneville main dam. II -- Concreting Technique
Engineering Index Backfile | 1936
|TEMPORARY COFFERDAM METHOD, TEMPORARY COFFERDAM STRUCTURE
European Patent Office | 2022
|