Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Callender-Hamilton type cable bridge at Uxbridge
To take cables across canal special cable bridge was constructed by Callender's Cable and Construction Co of unit construction type; it is double truss type with oa length of 90 ft and clear span of 80 ft.
Callender-Hamilton type cable bridge at Uxbridge
To take cables across canal special cable bridge was constructed by Callender's Cable and Construction Co of unit construction type; it is double truss type with oa length of 90 ft and clear span of 80 ft.
Callender-Hamilton type cable bridge at Uxbridge
Engineering
Engineering ; 143
1937
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Callender-Hamilton system temporary bridge
Engineering Index Backfile | 1936
Tests of Callender-Hamilton unit-construction bridge
Engineering Index Backfile | 1937
Callender-Hamilton bridging system
Engineering Index Backfile | 1946
|Erection of callender-Hamilton unit-construction bridges
Engineering Index Backfile | 1939
Callender-Hamilton standardized bridging in war and postwar use
Engineering Index Backfile | 1947
|