Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Practical aspects of salt-crust process for binding mine roadway dust
Dust deposited at rates which would necessitate stone dusting up to three times weekly was entrapped by salt layer in 2-day cycles; treatment resulted in hard walking surface, but not in reduction of airborne dust, except insofar as this has been due to re-dispersion of floor dust. (see also Instn Min Engrs -- Trans v 116 pt 11 Aug 1957 p 989-1012 (discussion) 1012-7)
Practical aspects of salt-crust process for binding mine roadway dust
Dust deposited at rates which would necessitate stone dusting up to three times weekly was entrapped by salt layer in 2-day cycles; treatment resulted in hard walking surface, but not in reduction of airborne dust, except insofar as this has been due to re-dispersion of floor dust. (see also Instn Min Engrs -- Trans v 116 pt 11 Aug 1957 p 989-1012 (discussion) 1012-7)
Practical aspects of salt-crust process for binding mine roadway dust
Colliery Guardian
Brookes, F.R. (Autor:in) / Linacre, E.T. (Autor:in) / Woodhead, D.W. (Autor:in)
Colliery Guardian ; 194
1957
9 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Tectonic aspects of mine roadway maintenance
Engineering Index Backfile | 1948
|Dust removal equipment for coal mine safety production roadway
Europäisches Patentamt | 2022
|COAL MINE RUBBER-TYRED VEHICLE AUXILIARY TRANSPORT ROADWAY ACCUMULATED DUST CLEANING ROBOT
Europäisches Patentamt | 2024
|Modelling of mine roadway fires
Engineering Index Backfile | 1965
|Practical aspects of mine ventilation
Engineering Index Backfile | 1948
|