A platform for research: civil engineering, architecture and urbanism
Concreting begun on 13.05-mile Adams tunnel
Brief description of procedure and concreting equipment being used in lining Alva B Adams tunnel under Continental Divide.
Concreting begun on 13.05-mile Adams tunnel
Brief description of procedure and concreting equipment being used in lining Alva B Adams tunnel under Continental Divide.
Concreting begun on 13.05-mile Adams tunnel
Concrete
Concrete ; 53
1945
3 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1946
Engineering Index Backfile | 1931
|Concreting west Delaware tunnel
Engineering Index Backfile | 1960
|Concreting operations on Moffat water tunnel
Engineering Index Backfile | 1936
|Concreting a tunnel by compressed air
Engineering Index Backfile | 1913
|