Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
$4,000,000 traffic tunnel planned for Pittsburgh
General details and cross sectional drawing of twin tube vehicular tunnel which goes under Squirrel Hill; details of reversible ventilation given; notes on drainage, paving, and lighting.
$4,000,000 traffic tunnel planned for Pittsburgh
General details and cross sectional drawing of twin tube vehicular tunnel which goes under Squirrel Hill; details of reversible ventilation given; notes on drainage, paving, and lighting.
$4,000,000 traffic tunnel planned for Pittsburgh
Roads Streets
Roads and Streets ; 87
1944
3 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
$4,000,000 arterial at Portland
Engineering Index Backfile | 1940
4,000,000-gallon elevated storage tank
Engineering Index Backfile | 1933
4,000,000 gallon elevated storage project
Engineering Index Backfile | 1933
|21 twin-engine units speeded 4,000,000-yard grading job
Engineering Index Backfile | 1957
|21 twin-engine units speeded 4,000,000-yard grading job
Engineering Index Backfile | 1957
|