Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
$4,000,000 arterial at Portland
Outline of project for construction of $4,000,000 modern six-lane arterial along Willamette River water front in Portland, Ore, to provide improved access to business areas of city from both north and south highway approaches, as well as to give high speed boulevard for through traffic.
$4,000,000 arterial at Portland
Outline of project for construction of $4,000,000 modern six-lane arterial along Willamette River water front in Portland, Ore, to provide improved access to business areas of city from both north and south highway approaches, as well as to give high speed boulevard for through traffic.
$4,000,000 arterial at Portland
Western Construction News
1940
2 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
$4,000,000 traffic tunnel planned for Pittsburgh
Engineering Index Backfile | 1944
4,000,000-gallon elevated storage tank
Engineering Index Backfile | 1933
4,000,000 gallon elevated storage project
Engineering Index Backfile | 1933
|21 twin-engine units speeded 4,000,000-yard grading job
Engineering Index Backfile | 1957
|21 twin-engine units speeded 4,000,000-yard grading job
Engineering Index Backfile | 1957
|