Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
21 twin-engine units speeded 4,000,000-yard grading job
Earthmoving on 13.9-mi road section near Bristol, Ind, included mile-long fill, max height 34 ft; specific items consisted of 3,000,000 cu yd of borrow material, 55,000 cu yd of peat excavation, 106,000 yd of special fill, 406,000 yd of common, and 176,000 yd of ditch and waterway excavation; features of equipment used on job. (see also World Construction v 10 n 6 June 1957 p 24, 27-8)
21 twin-engine units speeded 4,000,000-yard grading job
Earthmoving on 13.9-mi road section near Bristol, Ind, included mile-long fill, max height 34 ft; specific items consisted of 3,000,000 cu yd of borrow material, 55,000 cu yd of peat excavation, 106,000 yd of special fill, 406,000 yd of common, and 176,000 yd of ditch and waterway excavation; features of equipment used on job. (see also World Construction v 10 n 6 June 1957 p 24, 27-8)
21 twin-engine units speeded 4,000,000-yard grading job
Roads Streets
Persons, H.C. (Autor:in)
Roads and Streets ; 100
1957
3 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
21 twin-engine units speeded 4,000,000-yard grading job
Engineering Index Backfile | 1957
|$4,000,000 arterial at Portland
Engineering Index Backfile | 1940
Triple push loading speeded Minnesota grading job
Engineering Index Backfile | 1945
$4,000,000 traffic tunnel planned for Pittsburgh
Engineering Index Backfile | 1944
4,000,000-gallon elevated storage tank
Engineering Index Backfile | 1933