Rance River cutoff for construction of tidal power plant
Work on construction of cofferdam cutting river from sea to form tidal water basin, is described; 600 m long dam consists of two anchorages formed by steel gabions 19 m in diam constructed from sheet piling, and 360 m long central part formed by 18 reinforced concrete caissons, 11 of which are 21 m in diam, and seven having 18 m diam, their height varying from 19 to 27 m; work was concluded partially under very difficult conditions caused by high tides.
Rance River cutoff for construction of tidal power plant
Work on construction of cofferdam cutting river from sea to form tidal water basin, is described; 600 m long dam consists of two anchorages formed by steel gabions 19 m in diam constructed from sheet piling, and 360 m long central part formed by 18 reinforced concrete caissons, 11 of which are 21 m in diam, and seven having 18 m diam, their height varying from 19 to 27 m; work was concluded partially under very difficult conditions caused by high tides.
Rance River cutoff for construction of tidal power plant
La coupure de la Rance pour la construction de l'usine maremotrice
Mauboussin, G. (Autor:in) / Souille, G. (Autor:in)
Genie Civil ; 141
1964
11 pages
Aufsatz (Zeitschrift)
Französisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1966
|Engineering Index Backfile | 1966
|Gating sluices of La Rance tidal power plant
Engineering Index Backfile | 1964
|Cofferdams of Rance tidal power stations
Engineering Index Backfile | 1964
|The tidal power plant on the Rance estuary: its history revisited for a part