Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Methods used in raising Tennessee River bridge at Guntersville, Ala, consisting of 3-span 767-ft continuous steel truss, which was lifted 17 ft as unit, and 1600 ft of approach structure (both concrete T-beam and steel girder construction) spans of which were raised distances varying from 8 1/2 to 17 ft, with aid of novel gantry crane; hoisting arrangement. (see also Concrete and Constr Eng v 35 n 4 Apr 1940 p 208-12)
Methods used in raising Tennessee River bridge at Guntersville, Ala, consisting of 3-span 767-ft continuous steel truss, which was lifted 17 ft as unit, and 1600 ft of approach structure (both concrete T-beam and steel girder construction) spans of which were raised distances varying from 8 1/2 to 17 ft, with aid of novel gantry crane; hoisting arrangement. (see also Concrete and Constr Eng v 35 n 4 Apr 1940 p 208-12)
Long bridge raised by unique procedure
Eng News-Rec
Harsch, E. (Autor:in)
Engineering News-Record ; 123
1939
5 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Long bridge raised by unique procedure
Engineering Index Backfile | 1940
|Long bridge raised 15 ft under traffic
Engineering Index Backfile | 1950
Columbia river bridge raised 45 ft
Engineering Index Backfile | 1940
Long concrete and steel bridge raised 10 feet with gantry and jacks
Engineering Index Backfile | 1943
|Unique rig sets girders for long Canadian Bridge
Engineering Index Backfile | 1961