Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Heaviest building girder, 133 tons, erected in New York post office addition
Erection of girder, 116 ft long in construction of substructure for New York Post Office addition, over electrified tracks of Pennsylvania Railroad passenger terminal; construction hazards; safety measures; trucking of girders; erection derricks; suspended plank floor; fireproofing; concreting.
Heaviest building girder, 133 tons, erected in New York post office addition
Erection of girder, 116 ft long in construction of substructure for New York Post Office addition, over electrified tracks of Pennsylvania Railroad passenger terminal; construction hazards; safety measures; trucking of girders; erection derricks; suspended plank floor; fireproofing; concreting.
Heaviest building girder, 133 tons, erected in New York post office addition
Construction Methods
Construction Methods ; 15
1933
4 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1956
"Unilever House" office building erected for "Royale Belge"
Engineering Index Backfile | 1956
|Quebec's fifteenth welded girder bridge erected in record time
Engineering Index Backfile | 1949
|400 tons -- 21 floors, Birmingham's first air conditioned office building
Engineering Index Backfile | 1940
|