A platform for research: civil engineering, architecture and urbanism
Arch dam constructed with powerhouse sited immediately downstream; top of dam is at elevation 634, with lowest foundation at elevation 350; water is fed to five turbines in powerhouse by five 16 ft diam penstocks; powerhouse contains five machines operating under net head of 200 ft total rated capacity of 180,000 kW.
Arch dam constructed with powerhouse sited immediately downstream; top of dam is at elevation 634, with lowest foundation at elevation 350; water is fed to five turbines in powerhouse by five 16 ft diam penstocks; powerhouse contains five machines operating under net head of 200 ft total rated capacity of 180,000 kW.
Maraetai power project
New Zealand Eng
James, L.S. (author)
1956
13 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1959
|British Library Online Contents
|Engineering Index Backfile | 1956
|Engineering Index Backfile | 1950
|Ontario's biggest power project
Engineering Index Backfile | 1951