Boilerplate, thick concrete complicates road drain job
Pavement from 30 to 42-in. thick had to be blasted to install new drainage system under San Diego, Calif, grade separation structure; 60% gelatin dynamite was used and charge varied from 2/3 to 1 lb per hole; spacing between successive charges was 12 to 15 in.; wellpoints were put down 2 ft from each side of ditch line.
Boilerplate, thick concrete complicates road drain job
Pavement from 30 to 42-in. thick had to be blasted to install new drainage system under San Diego, Calif, grade separation structure; 60% gelatin dynamite was used and charge varied from 2/3 to 1 lb per hole; spacing between successive charges was 12 to 15 in.; wellpoints were put down 2 ft from each side of ditch line.
Boilerplate, thick concrete complicates road drain job
Eng News-Rec
Engineering News-Record ; 145
1950
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
British Library Online Contents | 1997
|A TV Complicates the Mantelpiece
British Library Online Contents | 2007
|Engineering Index Backfile | 1963
Toxic Gas Complicates Train Crash Rescue
British Library Online Contents | 1996
Hurricane Complicates Platform Salvage In Gulf
Online Contents | 2004