A platform for research: civil engineering, architecture and urbanism
Boilerplate, thick concrete complicates road drain job
Pavement from 30 to 42-in. thick had to be blasted to install new drainage system under San Diego, Calif, grade separation structure; 60% gelatin dynamite was used and charge varied from 2/3 to 1 lb per hole; spacing between successive charges was 12 to 15 in.; wellpoints were put down 2 ft from each side of ditch line.
Boilerplate, thick concrete complicates road drain job
Pavement from 30 to 42-in. thick had to be blasted to install new drainage system under San Diego, Calif, grade separation structure; 60% gelatin dynamite was used and charge varied from 2/3 to 1 lb per hole; spacing between successive charges was 12 to 15 in.; wellpoints were put down 2 ft from each side of ditch line.
Boilerplate, thick concrete complicates road drain job
Eng News-Rec
Engineering News-Record ; 145
1950
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
British Library Online Contents | 1997
|Toxic Gas Complicates Train Crash Rescue
British Library Online Contents | 1996
Engineering Index Backfile | 1963
A TV Complicates the Mantelpiece
British Library Online Contents | 2007
|Hurricane Complicates Platform Salvage In Gulf
Online Contents | 2004