Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Excavation is shored new way
New way of shoring walls of building excavations used in foundation work at 12-story Bank of California construction site in San Francisco features concrete cofferdam built in trenches and sub-surface steel erected from top to bottom; concrete cofferdam is installed before excavation by inserting H-piles in predrilled holes, removing material between piles and filling space with tremie concrete.
Excavation is shored new way
New way of shoring walls of building excavations used in foundation work at 12-story Bank of California construction site in San Francisco features concrete cofferdam built in trenches and sub-surface steel erected from top to bottom; concrete cofferdam is installed before excavation by inserting H-piles in predrilled holes, removing material between piles and filling space with tremie concrete.
Excavation is shored new way
Western Construction
Western Construction ; 40
1965
4 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Sandwich Connection Design for Shored Reinforced Earth Walls
British Library Conference Proceedings | 2009
|Shored/Reshored Construction of Flat Plates
Online Contents | 2015
|Effect of Interface Connection on Performance of Narrow Shored Reinforced Earth Wall
Springer Verlag | 2022
|