A platform for research: civil engineering, architecture and urbanism
Interim consideration of Columbia River entrance
Providing for entrance channel of suitable alignment at mouth of Columbia River; channel would be obtained by dredging and construction of spur jetty on north shore, in combination with existing jetties, at additional cost of $10,- 340,000; re-evaluation of natural forces controlling regimen of entrance area.
Interim consideration of Columbia River entrance
Providing for entrance channel of suitable alignment at mouth of Columbia River; channel would be obtained by dredging and construction of spur jetty on north shore, in combination with existing jetties, at additional cost of $10,- 340,000; re-evaluation of natural forces controlling regimen of entrance area.
Interim consideration of Columbia River entrance
ASCE -- Proc (J Hydraulics Div)
Lockett, J.B. (author)
1959
24 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Interim Consideration of the Columbia River Entrance
ASCE | 2021
|British Library Conference Proceedings | 1997
|Arkansas river navigation entrance
Engineering Index Backfile | 1967
|