Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Shallow prestressed girders for Fresno underpass
Shallow and hollow box girders, of prestressed and precast concrete, carry four railroad tracks over five-lane street in Fresno, Calif; bridge has two spans -- 51.0 ft and 58.0 ft -- and overall width of 74.0 ft; deck contains 39 of 3.5-ft square pretensioned girder units; girders are connected by epoxy grout joints which transfer live load shear and provide torsional resistance; box girders are seated on elastomeric pads to accommodate vertical and temperature movement.
Shallow prestressed girders for Fresno underpass
Shallow and hollow box girders, of prestressed and precast concrete, carry four railroad tracks over five-lane street in Fresno, Calif; bridge has two spans -- 51.0 ft and 58.0 ft -- and overall width of 74.0 ft; deck contains 39 of 3.5-ft square pretensioned girder units; girders are connected by epoxy grout joints which transfer live load shear and provide torsional resistance; box girders are seated on elastomeric pads to accommodate vertical and temperature movement.
Shallow prestressed girders for Fresno underpass
Civ Eng (NY)
Studzinski, S.H. (Autor:in)
1967
3 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1955
|Unusual methods used in repair of roof girders in street underpass
Engineering Index Backfile | 1929
|UNDERPASS MONITORING SYSTEM, UNDERPASS MONITORING DEVICE, AND UNDERPASS MONITORING METHOD
Europäisches Patentamt | 2016
|Construction method of prestressed structure on branch section of urban underpass
Europäisches Patentamt | 2024
|Prestressed steel lattice girders
Engineering Index Backfile | 1954
|