Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
The San Leandro earth dam of the Oakland water works
An illustrated description of a high earth dam originally built in 1874-5, but since raised to a height of 125 ft. above the original surface, 155 ft. above the bottom of the central puddle trench, and 158 ft. above the bottom of the concrete-filled secondary trenches. A large part of the embankment was sluiced in by the hydraulic process. (1600 w.)
The San Leandro earth dam of the Oakland water works
An illustrated description of a high earth dam originally built in 1874-5, but since raised to a height of 125 ft. above the original surface, 155 ft. above the bottom of the central puddle trench, and 158 ft. above the bottom of the concrete-filled secondary trenches. A large part of the embankment was sluiced in by the hydraulic process. (1600 w.)
The San Leandro earth dam of the Oakland water works
Eng News
Bassell, Burr (Autor:in)
1902
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
The upper San Leandro project of the east bay water company, Oakland, California
Engineering Index Backfile | 1926
Upper San Leandro water project
Engineering Index Backfile | 1928
|art - Installations - Leandro Erlich
Online Contents | 2007
Leandro Valencia Locsin : filipino architect
UB Braunschweig | 2022
|The 80-ft. Concrete-arch bridge over the San Leandro Creek, San Leandro, Cal.
Engineering Index Backfile | 1903
|