Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
South Carolina's $20,000,000 hydroelectric development under way
Hydroelectric project on Saluda River near Columbia and Lexington, S. C.; earth dam will be constructed, 206 ft. in height and 7989 ft. long; on completion of pipes and concrete arch and diversion of river's course, work will be started on dam.
South Carolina's $20,000,000 hydroelectric development under way
Hydroelectric project on Saluda River near Columbia and Lexington, S. C.; earth dam will be constructed, 206 ft. in height and 7989 ft. long; on completion of pipes and concrete arch and diversion of river's course, work will be started on dam.
South Carolina's $20,000,000 hydroelectric development under way
Mfrs. Rec
Garner, G. (Autor:in)
1928
4 pages
4 Figs.
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Transportation facilities planned for 20,000,000 people
Engineering Index Backfile | 1929
Engineering Index Backfile | 1928
|Cooling 20,000,000 tons of concrete
Engineering Index Backfile | 1942
|South Carolina's largest grading project
Engineering Index Backfile | 1939
|Constructing $20,000,000 Alaska Barge Terminal at excursion inlet
Engineering Index Backfile | 1944
|