Description of cooling operations for placing concrete in Grand Coulee Dam; to cool concrete, 2000 mi of one-in. pipe had to be embedded in concrete and cold water pumped through these pipes until concrete had set and been cooled to its normal temperature. From Reclamation Era Nov 1941.
Description of cooling operations for placing concrete in Grand Coulee Dam; to cool concrete, 2000 mi of one-in. pipe had to be embedded in concrete and cold water pumped through these pipes until concrete had set and been cooled to its normal temperature. From Reclamation Era Nov 1941.
Cooling 20,000,000 tons of concrete
Water Works Eng
Snyder, L.J. (Autor:in)
1942
4 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
South Carolina's $20,000,000 hydroelectric development under way
Engineering Index Backfile | 1928
|Constructing $20,000,000 Alaska Barge Terminal at excursion inlet
Engineering Index Backfile | 1944
|14,500 steel H-piles support $20,000,000 strip mill
Engineering Index Backfile | 1936
Transportation facilities planned for 20,000,000 people
Engineering Index Backfile | 1929
Costs of dredging 20,000,000 cu. yds. of material in 1911, with 39 hydraulic pipe line dredges
Engineering Index Backfile | 1912