Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Constructing $20,000,000 Alaska Barge Terminal at excursion inlet
How Guy F. Atkinson Co fought time and how difficulties due to severe winter were overcome in construction of base for American defense supplies; summary of work done; piling; docks; marine ways; channel changes; road construction; bridges; warehouse fill; blasting 1,000, 000 yards of rock; gravel; asphalt emulsion grouted pavement; sewers; water system; concreting; buildings; servicing and repairing equipment; oil storage.
Constructing $20,000,000 Alaska Barge Terminal at excursion inlet
How Guy F. Atkinson Co fought time and how difficulties due to severe winter were overcome in construction of base for American defense supplies; summary of work done; piling; docks; marine ways; channel changes; road construction; bridges; warehouse fill; blasting 1,000, 000 yards of rock; gravel; asphalt emulsion grouted pavement; sewers; water system; concreting; buildings; servicing and repairing equipment; oil storage.
Constructing $20,000,000 Alaska Barge Terminal at excursion inlet
Pac Bldr Engr
Edwards, H.H. (Autor:in)
1944
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Cooling 20,000,000 tons of concrete
Engineering Index Backfile | 1942
|South Carolina's $20,000,000 hydroelectric development under way
Engineering Index Backfile | 1928
|14,500 steel H-piles support $20,000,000 strip mill
Engineering Index Backfile | 1936
Transportation facilities planned for 20,000,000 people
Engineering Index Backfile | 1929
All-weather tanker terminal for cook inlet, Alaska
Engineering Index Backfile | 1969
|