Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Problems and progress -- Hood canal bridge
Repair and completion contract under way on storm damaged pontoon bridge; adding post tensioning cables, more bolts around joints, together with assembling and anchoring remaining pontoons; see paper on construction of bridge indexed in Engineering Index 1959 p 170 from Nov 1958 issue.
Problems and progress -- Hood canal bridge
Repair and completion contract under way on storm damaged pontoon bridge; adding post tensioning cables, more bolts around joints, together with assembling and anchoring remaining pontoons; see paper on construction of bridge indexed in Engineering Index 1959 p 170 from Nov 1958 issue.
Problems and progress -- Hood canal bridge
Western Construction
Western Construction ; 36
1961
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Anchorages for hood canal bridge present engineering problem
Engineering Index Backfile | 1958
|Extending the Service Life of the Hood Canal Floating Bridge
British Library Conference Proceedings | 1993
|Online Contents | 1995
Prestressed pontoons for Hood Canal
Engineering Index Backfile | 1958