An overview of the Seikan tunnel project
AbstractThe Seikan Tunnel, the survey and excavation of which were begun in 1946 and 1964, respectively, is an undersea accessway connecting the island of Honshu and Hokkaido, Japan. The main tunnel was completed in 1985. Final completion of the tunnel is scheduled for 1987. The total length of the tunnel is 53 850 m, running under the seabed; water depth reaches a maximum of 140 m at certain points. The tunnel as excavated with a minimum overburden of 100 m. This paper outlines the construction work on the Seikan Tunnel, including the background history to tunnel construction, the basic design (alignment, type of cross-section and undersea construction system chosen), the construction work (schedule and contract system for the undersea portion), the operation facilities (track, electrical facilities, drainage facilities, ventilation and fire prevention measures), and the financing.
RésuméLe tunnel de Seikan, dont l'étape de reconnaissance et l'excavation avaient respectivement commencé en 1946 et 1964, est une voie d'accès sous la mer liant les îles de Honshu et de Hokkaido au Japon. Le tunnel principal fut fini en 1985. L'aboutissement des travaux est prévu pour 1987. La longueur totale du tunnel est de 53,85 km percé sous le fond de la mer et la profondeu de l'eau atteint un maximum de 140 m en certain points. Le tunnel fut excavé avec un terrain de couverture d'au moins 100 m. L'article donne un aper¢u des travaux de construction du tunnel de Seikan, les raisons et l'origine de la construction, la conception de base (alignement, coupe et système de construction sous la mer choisi), les opérations de construction (planning et système de contrats pour la partie sous la mer), les constructions des facilités (rail, electricité, drainage, ventilation et prévention contre le feux), ainsi qu'un aper¢u du financement.
An overview of the Seikan tunnel project
AbstractThe Seikan Tunnel, the survey and excavation of which were begun in 1946 and 1964, respectively, is an undersea accessway connecting the island of Honshu and Hokkaido, Japan. The main tunnel was completed in 1985. Final completion of the tunnel is scheduled for 1987. The total length of the tunnel is 53 850 m, running under the seabed; water depth reaches a maximum of 140 m at certain points. The tunnel as excavated with a minimum overburden of 100 m. This paper outlines the construction work on the Seikan Tunnel, including the background history to tunnel construction, the basic design (alignment, type of cross-section and undersea construction system chosen), the construction work (schedule and contract system for the undersea portion), the operation facilities (track, electrical facilities, drainage facilities, ventilation and fire prevention measures), and the financing.
RésuméLe tunnel de Seikan, dont l'étape de reconnaissance et l'excavation avaient respectivement commencé en 1946 et 1964, est une voie d'accès sous la mer liant les îles de Honshu et de Hokkaido au Japon. Le tunnel principal fut fini en 1985. L'aboutissement des travaux est prévu pour 1987. La longueur totale du tunnel est de 53,85 km percé sous le fond de la mer et la profondeu de l'eau atteint un maximum de 140 m en certain points. Le tunnel fut excavé avec un terrain de couverture d'au moins 100 m. L'article donne un aper¢u des travaux de construction du tunnel de Seikan, les raisons et l'origine de la construction, la conception de base (alignement, coupe et système de construction sous la mer choisi), les opérations de construction (planning et système de contrats pour la partie sous la mer), les constructions des facilités (rail, electricité, drainage, ventilation et prévention contre le feux), ainsi qu'un aper¢u du financement.
An overview of the Seikan tunnel project
Matsuo, Shogo (Autor:in)
Tunnelling and Underground Space Technology ; 1 ; 323-331
01.01.1986
9 pages
Aufsatz (Zeitschrift)
Elektronische Ressource
Englisch
British Library Conference Proceedings | 1993
|ASCE | 2021
|Elsevier | 1986
|Test excavations for Seikan undersea tunnel
Engineering Index Backfile | 1967
Technical development for the Seikan tunnel
Elsevier | 1986
|