Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Gas lift method based secondary hole cleaning construction process for overlength pile foundations
The invention discloses a gas lift method based secondary hole cleaning construction process for overlength pile foundations. The gas lift method based secondary hole cleaning construction process includes: (1), measuring hole depth and hole bottom mud specific gravity, and mounting a guide pipe; (2), arranging a segmental galvanized air pipe in the guide pipe; (3), connecting the guide pipe with a guide pipe connector portion of a gas lift cap, connecting an air pipe connector portion of the gas lift cap with an air compressor through a high-pressure air pipe, connecting a bent pipe of the gas lift cap with a mud outlet pipe, and completing connection of a mud supplement pipe in a hole; (4), turning on an airflow control switch of the air pipe connector portion after mud supplement, starting the air compressor to inject high-pressure gas into the guide pipe, and continuously supplementing a proper proportion of mud into the hole synchronously; (5), according to the measured hole depth and sediment thickness, lifting the gas lift cap by lifting equipment to probe downwardly again, cleaning sediments at the bottom of the hole layer by layer, and stopping hole cleaning until the hole depth, the sediment thickness and mud indexes meet standard requirements. By the gas lift method based secondary hole cleaning construction process, hole cleaning time is shortened greatly, construction efficiency is improved remarkably, and hole cleaning quality is high.
Gas lift method based secondary hole cleaning construction process for overlength pile foundations
The invention discloses a gas lift method based secondary hole cleaning construction process for overlength pile foundations. The gas lift method based secondary hole cleaning construction process includes: (1), measuring hole depth and hole bottom mud specific gravity, and mounting a guide pipe; (2), arranging a segmental galvanized air pipe in the guide pipe; (3), connecting the guide pipe with a guide pipe connector portion of a gas lift cap, connecting an air pipe connector portion of the gas lift cap with an air compressor through a high-pressure air pipe, connecting a bent pipe of the gas lift cap with a mud outlet pipe, and completing connection of a mud supplement pipe in a hole; (4), turning on an airflow control switch of the air pipe connector portion after mud supplement, starting the air compressor to inject high-pressure gas into the guide pipe, and continuously supplementing a proper proportion of mud into the hole synchronously; (5), according to the measured hole depth and sediment thickness, lifting the gas lift cap by lifting equipment to probe downwardly again, cleaning sediments at the bottom of the hole layer by layer, and stopping hole cleaning until the hole depth, the sediment thickness and mud indexes meet standard requirements. By the gas lift method based secondary hole cleaning construction process, hole cleaning time is shortened greatly, construction efficiency is improved remarkably, and hole cleaning quality is high.
Gas lift method based secondary hole cleaning construction process for overlength pile foundations
ZHANG SHIQUAN (Autor:in) / XU KESHUN (Autor:in) / YE FEI (Autor:in) / GAO JIAN (Autor:in) / XIE YULI (Autor:in) / CHEN SHEN (Autor:in) / CHEN XIAOQUN (Autor:in) / ZHU YULUAN (Autor:in)
10.06.2015
Patent
Elektronische Ressource
Englisch
Construction method for overlength jet grouting stiffness core combined pile
Europäisches Patentamt | 2015
|Method for wetland sludge excavation overlength steel sheet pile construction
Europäisches Patentamt | 2015
|Europäisches Patentamt | 2022
|Secondary hole cleaning construction method for pile foundation
Europäisches Patentamt | 2020
|Experimental Study on Bearing Behavior of Large-Diameter Overlength Squeezed Branch Pile
Trans Tech Publications | 2011
|