Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
The invention discloses a construction method for PVC piping of incoming and outgoing lines of a distribution box at a beam bottom. The links of integrated module machining and manufacture, integrated module installation, connection of the PVC piping and an integrated module are conducted and the problems that in a traditional beam bottom formwork hole forming construction method, a formwork is seriously damaged, the service life of the formwork is seriously shortened, and the piping is badly damaged in the formwork detaching process are solved; the problems that in a PVC lug-contained joint connection construction method, when the height of a beam is over 500 mm, a PVC lug-contained joint is difficult to fix, labor cost is too high, the PVC lug-contained joint is likely to be vibrated and damaged when not firmly fixed, the joint can not be found after the formwork is detached, and the post treatment difficulty is high are solved. By the adoption of a modularized manufacturing mode, joint quality and the machining speed are guaranteed, cost of engineering is reduced, the efficiency of the engineering is improved, and a powerful guarantee is provided for accelerating a construction schedule. The construction method can be suitable for building installation engineering of PVC matched pipe beam penetration of the incoming and outgoing lines of distribution boxes of standard floors and houses of all the urban complex, other office, hotel and department projects and the like.
The invention discloses a construction method for PVC piping of incoming and outgoing lines of a distribution box at a beam bottom. The links of integrated module machining and manufacture, integrated module installation, connection of the PVC piping and an integrated module are conducted and the problems that in a traditional beam bottom formwork hole forming construction method, a formwork is seriously damaged, the service life of the formwork is seriously shortened, and the piping is badly damaged in the formwork detaching process are solved; the problems that in a PVC lug-contained joint connection construction method, when the height of a beam is over 500 mm, a PVC lug-contained joint is difficult to fix, labor cost is too high, the PVC lug-contained joint is likely to be vibrated and damaged when not firmly fixed, the joint can not be found after the formwork is detached, and the post treatment difficulty is high are solved. By the adoption of a modularized manufacturing mode, joint quality and the machining speed are guaranteed, cost of engineering is reduced, the efficiency of the engineering is improved, and a powerful guarantee is provided for accelerating a construction schedule. The construction method can be suitable for building installation engineering of PVC matched pipe beam penetration of the incoming and outgoing lines of distribution boxes of standard floors and houses of all the urban complex, other office, hotel and department projects and the like.
Construction method for PVC piping of incoming and outgoing lines of distribution box at beam bottom
12.08.2015
Patent
Elektronische Ressource
Englisch
IPC:
E04G
SCAFFOLDING
,
Baugerüste
Trading (Portland) Places: The outgoing and incoming RIBA presidents
British Library Online Contents | 2015
PARKING FACILITY AND METHOD FOR INCOMING AND OUTGOING VEHICLES IN PARKING FACILITIES
Europäisches Patentamt | 2021