Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Equipment foundation dismounting-free bolt box construction method
The invention relates to an equipment foundation bolt box construction technology, in particular to an equipment foundation dismounting-free bolt box construction method. The problems that a traditional equipment foundation bolt box construction technology is long in construction period, large in construction labor intensity, high in construction cost and poor in construction quality are solved. The equipment foundation dismounting-free bolt box construction method comprises the following steps that a, a dismounting-free bolt box is prefabricated, wherein firstly, a square-barrel-shaped steel framework is formed by welding steel bars, the square-barrel-shaped steel framework is formed by welding the vertical steel bars and a plurality of square hoops in a vertical crossing mode, each square hoop is formed by welding four cross steel bars end to end, the outer side face of the square-barrel-shaped steel framework is wrapped by a fine-mesh screen mesh, and the fine-mesh screen mesh and the square-barrel-shaped steel framework are bound and fixed through binding wires; b, the dismounting-free bolt box is mounted; c, concrete is poured; d, the dismounting-free bolt box is protected. The equipment foundation dismounting-free bolt box construction method is suitable for construction of large equipment foundation bolt holes and preserved holes.
Equipment foundation dismounting-free bolt box construction method
The invention relates to an equipment foundation bolt box construction technology, in particular to an equipment foundation dismounting-free bolt box construction method. The problems that a traditional equipment foundation bolt box construction technology is long in construction period, large in construction labor intensity, high in construction cost and poor in construction quality are solved. The equipment foundation dismounting-free bolt box construction method comprises the following steps that a, a dismounting-free bolt box is prefabricated, wherein firstly, a square-barrel-shaped steel framework is formed by welding steel bars, the square-barrel-shaped steel framework is formed by welding the vertical steel bars and a plurality of square hoops in a vertical crossing mode, each square hoop is formed by welding four cross steel bars end to end, the outer side face of the square-barrel-shaped steel framework is wrapped by a fine-mesh screen mesh, and the fine-mesh screen mesh and the square-barrel-shaped steel framework are bound and fixed through binding wires; b, the dismounting-free bolt box is mounted; c, concrete is poured; d, the dismounting-free bolt box is protected. The equipment foundation dismounting-free bolt box construction method is suitable for construction of large equipment foundation bolt holes and preserved holes.
Equipment foundation dismounting-free bolt box construction method
YAO GUANGHUA (Autor:in) / ZHANG BINGMING (Autor:in) / LIU SHUYUN (Autor:in) / CHEN XIAOLIANG (Autor:in) / ZHAI XUBIN (Autor:in) / XIAO ZHENQING (Autor:in) / FENG YONGSHENG (Autor:in) / HOU WENQUAN (Autor:in) / SHI PENG (Autor:in) / ZHANG SHOUPENG (Autor:in)
26.08.2015
Patent
Elektronische Ressource
Englisch
IPC:
E02D
FOUNDATIONS
,
Gründungen
Split bolt dismounting device and construction method thereof
Europäisches Patentamt | 2020
|Foundation bolt fixing device and foundation bolt fixing construction method
Europäisches Patentamt | 2020
|Construction method for reserved hole of equipment foundation bolt
Europäisches Patentamt | 2015
|Raft plate beam quick mounting and dismounting split bolt and construction method thereof
Europäisches Patentamt | 2022
|