Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
The invention provides a connection method of steel bars between prefabricated parts by adopting a steel fiber mortar grouting sleeve and discloses a method for connecting the steel bars between the prefabricated parts by adopting the steel fiber mortar grouting sleeve. A used steel pipe sleeve is a common steel pipe (1); the steel bars (4) needing to be connected are inserted into the steel pipe sleeve from the two ends; and cement-based grouting materials (5) doped with steel fibers are poured into a sleeve cavity to form a steel bar butt-joint mortar anchor connection joint. According to the method, the used common steel pipe does not need to be excessively machined and only a grouting hole and a mortar discharging hole (3) need to be opened. After the steel fibers are added into traditional cement mortar, the strength can be remarkably improved; and even if the sleeve is changed into the common steel pipe, all performance requirements still can be met. By the aid of high-performance grouting mortar and the common steel pipe sleeve, the use cost can be greatly reduced; a sleeve machining process is simplified under the condition that the grouting mortar performance is guaranteed, the cost is saved and the construction difficulty is also reduced; and the method can be directly applied to actual construction.
The invention provides a connection method of steel bars between prefabricated parts by adopting a steel fiber mortar grouting sleeve and discloses a method for connecting the steel bars between the prefabricated parts by adopting the steel fiber mortar grouting sleeve. A used steel pipe sleeve is a common steel pipe (1); the steel bars (4) needing to be connected are inserted into the steel pipe sleeve from the two ends; and cement-based grouting materials (5) doped with steel fibers are poured into a sleeve cavity to form a steel bar butt-joint mortar anchor connection joint. According to the method, the used common steel pipe does not need to be excessively machined and only a grouting hole and a mortar discharging hole (3) need to be opened. After the steel fibers are added into traditional cement mortar, the strength can be remarkably improved; and even if the sleeve is changed into the common steel pipe, all performance requirements still can be met. By the aid of high-performance grouting mortar and the common steel pipe sleeve, the use cost can be greatly reduced; a sleeve machining process is simplified under the condition that the grouting mortar performance is guaranteed, the cost is saved and the construction difficulty is also reduced; and the method can be directly applied to actual construction.
Connection method of steel bars between prefabricated parts by adopting steel fiber mortar grouting sleeve
07.10.2015
Patent
Elektronische Ressource
Englisch
IPC:
E04C
STRUCTURAL ELEMENTS
,
Bauelemente
Europäisches Patentamt | 2015
|Steel bar full-grouting sleeve for prefabricated concrete strong connection
Europäisches Patentamt | 2015
|Europäisches Patentamt | 2022
|Europäisches Patentamt | 2020
|