Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Greening system and greening method for prefabricated arch body bearing-type vegetation concrete side slope
The invention discloses a greening system for a prefabricated arch body bearing-type vegetation concrete side slope. The greening system comprises a plurality of rows of arc body bearing devices laid along the surface of the side slope. The arc body bearing devices comprise a plurality of prefabricated arc bodies. Every two prefabricated arc bodies are connected through a stressing pier, and the stressing piers are built on the side slope through bolts embedded in the side slope. A water storage pool is installed at the top of the side slope. A plurality of multistage water supplying devices which are vertically arranged and used for watering vegetation around each prefabricated arc body are communicated with the water storage pool. According to the greening system and a greening method for the prefabricated arch body bearing-type vegetation concrete side slope, the problem brought by the cement use amount can be solved, the cement use amount of vegetation concrete is decreased, the germination rate of seeds is increased, the gravity stress and later downward creeping influence of the vegetation concrete are lowered, cracking and falling of the vegetation concrete are reduced, and the downward shearing force of the terrene surface is decreased.
Greening system and greening method for prefabricated arch body bearing-type vegetation concrete side slope
The invention discloses a greening system for a prefabricated arch body bearing-type vegetation concrete side slope. The greening system comprises a plurality of rows of arc body bearing devices laid along the surface of the side slope. The arc body bearing devices comprise a plurality of prefabricated arc bodies. Every two prefabricated arc bodies are connected through a stressing pier, and the stressing piers are built on the side slope through bolts embedded in the side slope. A water storage pool is installed at the top of the side slope. A plurality of multistage water supplying devices which are vertically arranged and used for watering vegetation around each prefabricated arc body are communicated with the water storage pool. According to the greening system and a greening method for the prefabricated arch body bearing-type vegetation concrete side slope, the problem brought by the cement use amount can be solved, the cement use amount of vegetation concrete is decreased, the germination rate of seeds is increased, the gravity stress and later downward creeping influence of the vegetation concrete are lowered, cracking and falling of the vegetation concrete are reduced, and the downward shearing force of the terrene surface is decreased.
Greening system and greening method for prefabricated arch body bearing-type vegetation concrete side slope
LIU JIE (Autor:in) / YU ZHENMIN (Autor:in) / YANG XU (Autor:in) / YANG YU NAN (Autor:in) / YU JIE (Autor:in) / YUAN TENGFEI (Autor:in) / YAN LIZHOU (Autor:in) / SHEN KE (Autor:in)
03.02.2016
Patent
Elektronische Ressource
Englisch
Vegetation composition for slope greening and slope greening method using the same
Europäisches Patentamt | 2024
|Vegetation concrete canvas for slope greening and protection, preparation method and greening method
Europäisches Patentamt | 2020
|